Instant Campus
"Instant Campus" is a new student housing concept in Milan, focused on sustainable mobility and flexibility. The design features a wooden frame with prefabricated, movable room modules that adapt to changing campus needs. The project merges indoor and outdoor spaces by distributing functional areas across the plot. Solar analysis optimizes shading in summer and sun exposure in winter. Facade louvers control sunlight and reduce energy use. Vertical timber supports hold track beams for stacking modular rooms, which are prefabricated and easily inserted on-site.
Instant Campus is a new residential typology for students in Milan. The project explores the topic of sustainable mobility through a flexible and reconfigurable structure. Our design approach creates an adaptable wooden frame that incorporates prefabricated, movable and interchangeable room modules. In this way the building responds with optimal flexibility to the ever-changing needs of the campus.
STEP 01 - Defining the intervention area: The plot is divided into tow distinct zone; Green outdoor spaces (light yellow) and building spaces (dark yellow).
STEP 02 - A "Standard" configuration of the plot where the 100% of the construction goes on the front and a traditional, enclosed courtyard is created behind.
STEP 03 - By distributing the functional spaces of the build on both areas we are able to merge indoor and outdoor spaces and create a continuous line between landscape and building.
STEP 04 - Solar analysis on the South/West facades helped to maximise natural shading during summer days and maximise sun radiation during winter months.
STEP 05 - The louvers on the facade protects the Canyon-shaped exterior and allows to control sun and shading during the day and during different seasons reducing the consumption of energy for lighting, heating and cooling.
STEP 06 - The vertical timber elements supporting the overall structures are positioned.
STEP 07 - The track beams that will support the first and second layers of modular rooms are anchored to the vertical supports.
STEP 08 - Now It is possible to insert the "instant modules" entirely prefabricated in the factory.
Heading 1
Heading 2
Heading 3
Heading 4
Heading 5
Heading 6
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Block quote
Ordered list
- Item 1
- Item 2
- Item 3
Unordered list
- Item A
- Item B
- Item C
Bold text
Emphasis
Superscript
Subscript